Minsk CHP-4 is carrying out start-up operations on the main equipment from September 9 to 11. This is necessary for planned preparation for the heating season.

Photo: t.me/minskenergo
During such works, the readiness of the equipment for high loads is checked, as well as the ability of the CHP to continuously supply the city with heat and electricity.
"Minskenergo" warned that an increased noise level is possible during the works. The enterprise apologized to the residents of the city. The works will be carried out mainly during the daytime.
-
In Brest, a tiny one-room apartment is being sold, where a mother and daughter will remain living afterward. What's the catch?
-
Belarusian actor conducts costumed tours in Bialystok
-
A Young Belarusian Didn't Want to Serve Time in Russia for Drugs, So He Figured Out How to Quickly Get Out of the Colony — And Ended Up on Ukrainian Positions Near Pokrovsk
Comments