First power unit of BelNPP disconnected from the grid
Radiation background in the station area is unchanged.
Photo: BelNPP
On April 27, power unit No. 1 was disconnected from the grid to carry out preventive maintenance on the equipment.
The radiation background in the station area is unchanged, BelNPP reported in its Telegram channel.
It is reported that the work is being carried out to ensure the reliable operation of the power unit.